Om deze animatie te kunnen bekijken heb je de Adobe® Flash Player 8 nodig.
Deze plugin staat helaas niet op jouw PC geïnstalleerd. Je kunt de player volledig gratis en veilig downloaden en installeren van de Adobe® website

Production Recording & Supervision

Once detailed production schedules, which define realistic, feasible production targets in terms of quality, quantity and due dates, have been transmitted from the SteelPlanner System to the relevant Level 2 Process Optimization Systems, the process of tracking progress and performance begins. 

 

Through automated system interfaces to Level 2 systems or through manual operator entry, actual data on progress and performance can be collected and recorded in the SteelPlanner production results database.

 


Actual production data consists of:

  • Result data: For each intermediate or finished product produced, the actual result data relevant for logistics, production and quality control are collected, i.e. material properties, dimensions, test results.

  • Consumption data: For each product produced, the consumption data relevant for logistics and cost accounting control are collected, i.e. energy and commodities / media consumed.

  • Delay data: From each process unit, delay information with actual start / end times can be recorded, where applicable. This information can be used for production reporting, analysis and process improvement.

 

 

sp%20mes%20-%20production%20recording.jpg

 


To view this animation, you need the Adobe® Flash Player 8.
Unfortunately, this plugin was not found on your system. You can download and install the player from the Adobe® website.

© 2007 - Advanced information Systems
Wax Interactive
Sitemap | Privacy policy | Contact us